Managing work packages has historically been complex and challenging. The process has required separate project stakeholders to use multiple systems, leveraging a variety of disparate data sources. Teams are still doing it manually today through a variety of processes and tools. THE CURRENT PROCESS An installation work package is first initialized from a “parent” construction work package. The package is scoped by selecting individual components manually from drawings and then separately from a 3D model for specific disciplines such as pipe and steel. Next, the work is sequenced based on the...