Success Story
October 19, 2023

Avoiding Scaffolding Rework by Coordinating Across Work Packages

An oil and gas refinery in the Gulf States region manages a portfolio of multiple, simultaneous small cap projects.

The Challenge: 

On the project, scaffold was being erected with only pipe fitters consulted. Then when structural steel was mobilized for the same pipe rack, it was one and a half inch too high. Both crews had to stand down for rework and the project team lost three full schedule days to address the issue.

The Solution: 

O3’s ONBuild solution was introduced to create a master index of packages across areas to identify “shared” packages. Each planner coordinates across interdependent IWPs and captures all requirements and constraints in advance.

With ONBuild, the team:

  • Created a master index of all interdependent packages
  • Tracked and managed scaffolding for all IWPs
  • Coordinate Scaffolding requests across disciplines
  • Identify and clear constraints across Scaffold packages

Results: 

  • Scaffold is designed and installed for multidiscipline use
  • Reduced costs due to de-mobilization and re-mobilization
  • No lost schedule time
  • Better coordination across disciplines
 
Trusted. Proven. Unmatched.

Unlock  Game-Changing  Project Efficiency

Experience how O3 can streamline your project management, reduce costs, and ensure on-time, on-budget delivery. Start your journey to smarter execution today.

Product - ONDesign Screen view

Our Latest Resources

o3-solutions-launches-new-website
O3 Solutions Launches New Website
leading-the-charge-in-material-management-innovation-with-o3-and-aveva-erm-api-integration
Leading the Charge in Material Management Innovation with O3 and AVEVA ERM API Integration
taking-the-industry-by-storm:-o3′s-bold-vision-for-2025
Taking the Industry by Storm: O3′s Bold Vision for 2025