- Technology
- O3 Prism
Enterprise-Grade Data Management That Runs Itself
Project Data Rarely Arrives Ready to Build From
Capital projects run on data that comes in late, in every format and from dozens of sources. Design models are built for engineering rather than for packaging, sequencing or progress, so most teams close the gap with people: analysts cleaning spreadsheets, scripts written for each new data set and models sent back to engineering for missing attributes.
That manual work has a cost beyond the hours. When every refresh takes effort, teams update less often and plan from old revisions, and the missing attribute or conflicting tag that nobody caught shows up in the field instead of before import.
Point at Your Data, and O3 Prism Does the Rest
Your team connects O3 Prism to the place project data already lives, whether that's SharePoint, Autodesk Construction Cloud or a cloud folder, and it pulls new data on a schedule. From there, O3 Prism handles the steps that used to need an analyst: It detects what each file holds, sets the scope the data will serve, and checks everything against ISO, CII definitions or your own standard.
O3 Prism then generates the data deliverables for your team to review and finalize. Once the data is in, it checks every component and work package against what its scope requires, and every gap becomes a constraint or task with an owner. Your people step in only where judgment matters: reviewing the mapping and owning the fixes.
Built to Keep Construction Data Current, Complete and Under Your Control
Runs Itself
O3 recognizes, parses, maps and validates project data with little manual effort. Validation rules are reused across projects, so nobody writes a new script for each data set.
Any Source, Any Format
Data comes in the way your team already has it. O3 reads native 3D model formats and fabrication files, parses PDF and CAD drawings for title blocks, tables, bills of materials, revisions and tags, and takes flat files and API feeds. O3 integrates with any system seamlessly through OOTB integrations or enterprise REST APIs.
Knows What's Wrong, and Who's Fixing It
Two stages of validation, one before import and one inside O3, tell your team what is missing, why it matters and who owns the fix, with a raw-data analysis dashboard and tasks assigned directly from it.
A Refresh Your Team Can Afford to Run Every Day
When a new revision arrives, Data Review shows every add, delete and change in the context of the packages it affects. Planners accept, reject or quarantine changes row by row, preview the update in 3D before anything is overwritten, and O3 revalidates automatically with no new scripting. Because a refresh costs so little effort, the field works from current data.
Independently Audited Security
O3 is ISO 27001 and ISO 27701 certified, and maintains SOC 2 Type II and SOC 3 reports. Each customer runs in its own single-tenant environment with enterprise-grade security.
Your team can audit the software that handles your data rather than depend on handoffs between people and outside parties. O3 does not use customer data to train AI models.
Request O3's security documentation at trust.o3.solutions.
O3 Prism FAQs
Construction data validation means checking project data against a standard before anyone plans from it. O3 Prism checks your data against ISO 15926, CII definitions or your own standard, repairs unit mismatches and tag conflicts before import, then confirms that every component and work package has what its scope requires.
Yes. O3 reads native 3D model formats and fabrication files and flags missing data before anyone relies on it. Prism also covers drawings, takeoffs, bills of materials and documents, so the quality checks go beyond the model.
A common data environment stores and shares project files, while O3 Prism works on the data inside them. O3 doesn’t host your files. It connects to the platform where they already live, such as SharePoint or a cloud folder, then validates the contents and keeps them current.
See How O3 Prism Would Handle Your Project Data
When a new model revision lands, how long is it before your field team plans from it, and who does the work in between? In a demo, we'll walk through how O3 Prism takes in data from the places your team already uses, validates it against your standard and keeps every package current.