Forepersons often decide within their first few weeks whether a field app is worth their time. If the app won't load at the bottom of a pipe rack, or the right drawing for the package isn't there, they go back to paper. ONField, O3's mobile app for field crews, is built to win crews over from their first week on site: each work package and its drawings are on the device, and crews keep working when the signal drops.

What Happens When Crews Go Back to Paper

When forepersons go back to paper, a progress clerk retypes their notes into a spreadsheet at the end of the shift. Workface planners then schedule the next day from progress that is already a day old, and construction managers report quantities that no longer match the field.

Paper stalls the whole project. A field app keeps progress moving, as long as crews keep using it. Crews stick with a field app that holds everything a work package needs and works anywhere on site.

Put the Whole Work Package in the Foreperson's Hand

A foreperson should be able to answer a question about the work without leaving the work area. ONField puts each Installation Work Package (IWP) on a phone or tablet with its drawings, documents and 3D models. With several models combined into one view, the foreperson sees the whole work area at once. When a drawing needs a note, the foreperson marks it up on site and keeps working.

Keep Working When the Signal Drops

Even without a connection, forepersons and field engineers can use ONField to:

  • View the drawings and documents they took offline
  • Progress task steps on their IWPs
  • Manage constraints on their IWPs
  • Raise requests for information, punch items and constraints with photos attached

When the device reconnects, ONField syncs every update to the project. Planners see each foreperson's progress in ONBuild, O3's workface planning software for construction execution, without anyone retyping field notes.

Blog CTA 3

Sign-In Options for Every Company on Site

Crews can sign in to ONField with a QR code, a PIN or their company's single sign-on (SSO). Some projects have several companies on one O3 deployment. On those projects, Owner, contractor and subcontractor staff each sign in with their own company account, on the web and in the app, so field crews don't need a separate O3 login to get started.

Log Crew Time Against the Work

Forepersons fill in timesheets at the end of most shifts. In ONField, a foreperson logs the crew's hours from the field and can apply default IWPs and activities to the whole crew in one step. When a crew works on an IWP it wasn't assigned, the foreperson logs those hours against that IWP, so the timesheet matches the work done.

Crew hours roll up to each IWP and its progress curve (planned against actual progress over time) in ONBuild and in ONTrack, O3's flexible execution platform built for the realities of industrial construction. With hours and progress in one place, project controls teams can compare earned hours (the hours the completed work is worth) with actual hours instead of matching timesheets to progress by hand.

A Rollout Checklist for Your Field App

Whichever field app you choose, project teams keep crews on board by planning the rollout. We suggest five steps, in this order:

  1. Start with one crew. Run a pilot project with a foreperson who will tell you plainly what slows the crew down. Pick a crew with steady work ahead, so the pilot doesn't end with a demobilization.
  2. Settle sign-in with your IT team. Choose QR code, PIN or SSO ahead of time, so every crew member can sign in on day one. Subcontractor staff may need a different method from your own employees, so agree on one for each company up front.
  3. Load the work packages before the crew arrives. Make sure the drawings and models crews need are already on their devices. A foreperson who opens an empty package on day one won't trust the app on day two.
  4. Test the worst spot on site. Take the app into the area with the weakest coverage before rollout day. If updates from that area sync cleanly once the crew walks back into coverage, offline work is ready.
  5. Pick what crews record in week one. Start with task steps and constraints, then add timesheets once recording in the app is routine. Asking for everything at once turns a quick update into a chore at the end of a long shift.

From the second week on, track who records progress. When forepersons record most task steps on site, rather than planners in the office, crews have adopted the app. When the share of task steps forepersons record stays flat, go back to the pilot crew and ask what still gets in the way.

Get Started with ONField

Crews need a field app that works from their first shift, wherever they are on site. Forepersons and field engineers log crew hours in ONField, open their work packages and keep recording progress even when the signal drops.

Planners and project controls teams plan in ONBuild and ONTrack from same-day field progress, not a day-old spreadsheet. Field and office teams work from the same IWPs, as long as forepersons stay in the app. Start the rollout with one pilot crew, and they have a reason to keep using it well past their first few weeks.

Request a personalized demo and see how ONField would work for your crews on site.

Trusted. Proven. Unmatched.

Unlock  Game-Changing  Project Efficiency

Experience how O3 can streamline your project management, reduce costs, and ensure on-time, on-budget delivery. Start your journey to smarter execution today.

OnDesign Screen view of O3 product

Our Latest Resources

rolling-out-a-field-app-crews-actually-use:-onfield
Rolling Out a Field App Crews Actually Use: ONField
what-owners-expect-from-an-awp-execution-plan-in-nuclear-epc-bids
What Owners Expect from an AWP Execution Plan in Nuclear EPC Bids
project-templates-for-nuclear-construction:-plan-once,-repeat-on-every-unit
Project Templates for Nuclear Construction: Plan Once, Repeat on Every Unit