Contractors are constantly under extreme pressure to deliver projects on time and on budget, but outdated planning methods make it nearly impossible. Fragmented workflows, inconsistent execution, and poor visibility become the norm when teams rely on spreadsheets and disconnected systems. Workface planning software changes this dynamic by providing contractors with the digital infrastructure needed to implement Advanced Work Packaging (AWP) successfully.
Workface planning is the key to effective construction execution. It bridges the gap between high-level project planning and the day-to-day reality of crews in the field. Without proper workface planning, contractors face a cascade of problems: crews arriving at worksites without the materials, information, or prerequisites they need; supervisors scrambling to reassign workers when planned tasks can't proceed; and project leaders losing visibility into what's actually happening on the ground.
Workface planning provides contractors with the granular structure necessary to ensure that every work package contains all the necessary elements for successful execution, including detailed scope and drawings, material availability, and safety requirements. When implemented effectively through AWP best practices, workface planning enables contractors to sequence work logically, identify constraints before they cause delays, and give field teams the clarity they need to execute efficiently.
Some contractors take a basic approach to dividing work and call it workface planning, often to satisfy an owner's requirement. These approaches can be wildly inconsistent and usually don't take advantage of industry best practices for work packaging. When contractors use AWP best practices, they can establish consistent language for how packages should be created and a workflow for execution, eliminating a ton of headaches and rework.
Effective workface planning requires a single environment (preferably a digital software platform) that can be used to scope, manage, and progress all Installation Work Packages (IWPs) across all disciplines, functions, and package phases. When adhering to AWP, contractors can collaborate and communicate more effectively within the same platform and manage packages along the path of construction.
3. Effective Change Management
Shifting from one process to another can be daunting, but contractors can take advantage of step-by-step work package management by using a software solution to support AWP. Change management no longer has to be a stubborn transition. It's easier for the team to see what needs to be done and when, and what constraints are holding up work, making it more likely for all stakeholders to buy into the new process.
One of the biggest productivity killers on construction projects is constraints that prevent work from proceeding as planned. Workface planning software provides systematic constraint tracking across all work packages, giving contractors real-time visibility into material shortages, missing prerequisites, and other blockers. With a proactive approach, teams can resolve issues before they impact field execution, rather than discovering problems when crews are already mobilized and standing idle. The ability to identify and remove constraints early translates directly into improved labor productivity and schedule performance.
Modern workface planning platforms capture valuable data throughout the construction process, from planning rates to actual productivity metrics. This information gives contractors the insights they need to make informed decisions about resource allocation, sequencing adjustments, and performance improvement opportunities. Rather than relying on gut feelings, project leaders can analyze trends, benchmark performance, and identify areas where execution can be optimized. Over time, this data becomes an asset that helps contractors refine their processes and deliver increasingly predictable outcomes.
O3 Solutions has built its reputation by delivering purpose-built tools that address the real challenges contractors face. ONBuild, O3's construction execution and workface planning solution, helps project teams organize their work to avoid delays and overruns while reaching peak project efficiency.
The platform combines powerful functionality with an intuitive design, making it accessible to teams at all levels of AWP maturity. O3's solutions are grounded in industry best practices and battle-tested across hundreds of projects.
ONBuild provides complete visibility into work package status, constraints, and progress, enabling better coordination between disciplines and more effective field execution. With cloud-based access and real-time updates, teams can collaborate seamlessly regardless of location.
Our platform scales effortlessly from small projects to multi-contractor gigaprojects. With predictable pricing models, O3 makes advanced technology accessible to contractors of all sizes. Whether you're managing a single facility upgrade or coordinating multiple contractors across a large capital project, O3 adapts to your needs without unexpected costs or complexity.
The transition to digital workface planning starts with the right foundation. With over seven years of experience working with contractors and owners in the Advanced Work Packaging space, O3 has supported more than 500 projects and 20,000 users as they transform how they plan and execute their work. ONBuild provides everything contractors need to implement effective workface planning, from early work package development through field execution and closeout.
Our innovative platform gives teams the structure and visibility required to coordinate complex construction activities while adapting to each contractor's unique needs and existing workflows.
Request a personalized demo today to discover how O3 Solutions can help you achieve best-in-class project execution.